Welcome to Mincon Group Corporate
Engineering for the future. Building a better world for all.
24 Sep 2024
28 Feb 2023
10 Dec 2022
24 Oct 2022
News from Mincon
Drilling Gas Pipeline Under New York’s Most Congested Highway: Reliable Air Control Was the Key to Success
In early 2024, a 91-metre (300 ft) long and 1.2-metre (48”) diameter underground gas pipeline was installed beneath the most congested highway in the United States, the Cross Bronx Expressway in New York City.